LOCAL PREVIEW · 27 OCTOBER 2026 · PREPARED

Banking readiness — sample evidence brief

Bank liquidity and credit readiness — illustrative brief

Business question: which bounded readiness services could support banks and infrastructure sponsors? Focus on liquidity, asset classification, project finance and credit-model governance.

Checked 27 October 2026. Public-source scoping report with fictional calculations; not a client assessment, legal opinion, audit opinion or compliance certification. No bank data, interviews or outreach.

Regulatory verification register

TopicVerified scopeLimit / next check
Liquidity / B1Official record confirms TT50/2026/TT-NHNN, issued 30 September 2026, effective 1 December 2026.The complete PDF could not be read here due to retrieval size. Provided phase-in percentages, dates and early-adoption/LDR conditions remain pending article-level verification; effective date is not the same as every ratio deadline.
Asset classification / B2–B3TT31/2024 covers asset classification, effective 1 July 2024; TT37/2025 amends it.Use an updated legal set, not TT31 alone. Provisioning mechanics need a separately verified applicable legal basis; do not equate IFRS 9 ECL with local regulatory classification.
Funds / B4Official record confirms TT136/2025 amends fund-management rules and is effective 12 February 2026.A retrieved secondary full text [B7] describes a 65% basket containing multiple asset types, not exclusively infrastructure bonds. Verify the signed text before using that threshold. A fund rule is not an authorization for IBBC Capital to manage a fund or arrange an issue.
Other user inputsLetter 9608, AI selection deadline, NPL/coverage figures and aggregate infrastructure funding needs are research leads.News corroboration [B8–B9] was found for the letter and AI initiative, but original documents, eligibility and the cited figures are not fully checked. Exclude them from sales claims or filing deadlines until verified.

Commercial interpretation

Regulatory change supports a plausible preparation need, not proof that a particular bank has a consulting budget or will appoint IBBC Capital. Likely sponsors are ALM/Treasury, Risk, Finance and regulatory reporting; vendor access and a qualified delivery lead still need validation.

Start with a bounded readiness diagnostic: requirement-to-data mapping, reconciliations, ownership and an evidence-backed action plan. Full implementation, independent assurance and production scoring are separate engagements with different capability and independence requirements.

Synthetic calculation — no Vietnamese compliance conclusion

Basel background: LCR relates HQLA to net stressed outflows over thirty days; NSFR relates available stable funding to required stable funding. Local definitions, eligibility, weights, caps and reporting scope must be mapped separately. [B5–B6]

Assume already-adjusted HQLA=120 and net outflows=150, in the same arbitrary unit: illustrative LCR=80%. Assume ASF=900 and RSF=1,000: illustrative NSFR=90%. These numbers contain no real-bank data and are not calibrated under TT50.

Sensitivity only: reducing HQLA by 10 and increasing net outflows by 20 gives 110/170=64.71%. Reducing ASF by 50 with unchanged RSF gives 850/1,000=85%. Neither shock is a prescribed regulatory scenario or a pass/fail test.

Readiness evidence checklist

  1. Applicable entity, reporting scope and transition date
  2. Approved requirement register with article and version
  3. Data dictionary: product, currency, maturity, customer type and encumbrance
  4. Source-to-report lineage and reconciliation to accounting totals
  5. HQLA eligibility, haircuts and double-count controls
  6. Outflow/inflow assumptions and limits with supporting evidence
  7. ASF/RSF mapping and maturity treatment
  8. Manual overrides, approvals and change history
  9. Synthetic calculation, negative tests and reproducible reconciliation
  10. Issue owner, severity, due date and retest evidence

Adjacent workstreams

Credit: review the classification decision trail, overdue-day inputs, restructuring flags, accrued-interest reconciliation and exception handling. Record disputed cases for the bank’s authorized decision-maker; do not auto-reclassify real borrowers in this sample.

PPP: review model integrity, construction/operating assumptions, cash waterfall and downside debt-service capacity. AI credit: begin with model inventory, intended use, data rights, validation evidence, drift and override controls. These are proposed scoping areas, not findings about a client.

Official and methodological sources

  1. B1 · TT50 — hồ sơ Chính phủ — Metadata read; full PDF exceeds web retrieval limit
  2. B2 · TT31 — hồ sơ Chính phủ — Metadata read
  3. B3 · TT37 sửa TT31 — hồ sơ Chính phủ — Amendment identified
  4. B4 · TT136 — hồ sơ Chính phủ — Metadata read; full PDF exceeds web retrieval limit
  5. B5 · BIS — LCR overview — Basel background; not Vietnamese implementation law
  6. B6 · BIS — NSFR calculation — Basel background; not Vietnamese implementation law
  7. B7 · TT136 — bản toàn văn thứ cấp — Secondary text; signed original still to verify
  8. B8 · Thông tin nhiệm vụ AI tín dụng — News corroboration only; no original selection dossier checked
  9. B9 · Thông tin cuộc họp NHNN ngày 19/10/2026 — News corroborates letter 9608; not its full text